Brief: Follow along for a hands-on demonstration that highlights performance points of the 304 Stainless Steel Steam Shrinking Sleeve Machine. See how its 7.5KW power and advanced air-drying system achieve 100 bottles per minute efficiency with 99.9% droplet-free residue. Watch the variable speed conveyor and leak prevention system in action.
Related Product Features:
Constructed from durable 304 stainless steel with a brushed metallic finish for longevity and hygiene.
Powered by a 7.5KW super permanent magnet motor delivering three times higher airflow than comparable models.
Achieves high-speed processing efficiency of 100 bottles per minute for demanding production lines.
Features an advanced air-drying system with spider-bead hand mouthpiece and air knife for 99.9% droplet-free residue.
Equipped with a variable frequency drive motor for both the conveyor and bottle clamping belt for precise speed control.
Includes a mid-body leak-proof design with centralized condensate drainage to maintain a clean workspace.
Utilizes a PU food-grade lower belt and synchronous PU upper pressure belt for safe and reliable bottle handling.
Offers adjustable conveyor speed from 0 to 20 meters per minute to suit various production requirements.
FAQs:
What is the maximum output capacity of this steam shrinking sleeve machine?
The machine is designed for high-efficiency operation, capable of processing up to 100 bottles per minute with its advanced air-drying system.
What power supply is required for this machine?
This machine operates on a 380V 50-60Hz power supply with a total power consumption of 7.5KW to drive its high-performance motor and systems.
What after-sales support and warranty are provided with the machine?
The machine comes with a 1-year warranty for the complete machine from the equipment acceptance date, including free maintenance during the warranty period. Additionally, we provide free remote support via the Pinchi Tech AI cloud platform and comprehensive software update services.
What is the delivery time after placing an order?
The standard delivery time is 35 days after receipt of the advanced payment, ensuring timely deployment into your production facility.